Saturday, 17 August 2013
Have pressed the stub axels into the trailing arms ready for welding and test fitted the first unit into the hull.
Have a couple of small adjustments to make to the trailing arms to allow easier access to the bolts but otherwise very pleased with how they are sitting
![]() |
| Trailing arm with stub axel ready to be pressed into place |
![]() |
| Ready welding |
![]() |
| first unit installed for testing, all looking good |
![]() |
| Inside the hull |
Wednesday, 14 August 2013
Thursday, 8 August 2013
Monday, 5 August 2013
Road wheel welding jig
Well I finally got the jig sorted for the road wheel assembly and have matched up the rims with the hubs
![]() |
| The pin and steel plate make sure the hub sits the correct amount through the Rim for welding |
![]() |
| Spacers to give the correct gap between the two rims |
![]() |
| finished road wheels ready to go onto be painted etc |
Saturday, 3 August 2013
Drivetrain assembly
Have finished 99% of fabrication work and laid it all out to do one last full parts check before finishing assembly of the 862 parts into the tanks main drivetrain.
Consisting of
2x Main Drive Hubs (48 parts)
2x Front Wheel Assembly's (14 parts)
2x Track Assembly's (562 parts)
14 Road Wheel Assembly's (238 parts)