1/5th Abrams M1A2 RC Tank Project

Special thanks to Tim @

Special thanks to Tim @

Thursday, 8 August 2013

Have TIG welded the axles into the trailing arm, just waiting for one bit for each to come from the lathe and they are ready for paint.
 


 
Posted by SpudNik at 05:06
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2014 (1)
    • ►  February (1)
  • ▼  2013 (27)
    • ►  November (3)
    • ▼  August (10)
      • First track cut to length and put on for testing ...
      • Right Hand side on
      • Left hand side test fitted
      • Have pressed the stub axels into the trailing arm...
      • Have assembled the main drive hub on the motors a...
      • Have removed turret and side skirts to allow acc...
      • Have TIG welded the axles into the trailing arm, ...
      • Road wheel welding jig
      • Drivetrain assembly Have finished 99% of fabrica...
    • ►  July (6)
    • ►  June (2)
    • ►  May (1)
    • ►  April (1)
    • ►  March (3)
    • ►  February (1)
  • ►  2012 (18)
    • ►  September (3)
    • ►  July (2)
    • ►  June (2)
    • ►  May (5)
    • ►  April (6)

About Me

SpudNik
Father of 6 who loved battlefield desert combat so much he desided to build a tank for his son and him to play with
View my complete profile
Picture Window theme. Powered by Blogger.