Have finally received the two 3mtr lengths of 2060 chain for the tracks on the tank
Have started cutting the pieces to make up the main drive hubs for the tracks
Main drive gear cut from 10mm Mild Steel, the smaller plates will be threaded and will sandwich the hubs together |
Inside and outside track sprockets cut from 6mm, these are more for show as the main drive gear will be doing all the work |