Special thanks to Tim @

Sunday, 24 March 2013

Video of cutting the suspension units



And the assembled units movement

Saturday, 23 March 2013

Finalised the suspension design and cut the first unit to confirm it working as required.
Am using a much larger spring in this version so that it is able to hold even more.
Version 1 and 2
 
 
Fresh of the machine as they are cut, very little wastage of 10mm Aluminium
Parts broken out, only a very small amount of filling on the tabs that held it all together while cutting

All parts ready for assembly, the spring is one of 3 cut from one bigger spring, the steel shaft is just for testing the unit, these will be spun on a lathe with a thread on the end as well



Version 3 which will be used in the tank, expected lift 17-18kg's

 

Tuesday, 12 March 2013

Final coats of primer are on and its time to start on the suspension units and road wheels.


All primed up and looking a lot cleaner without the rust
 
 
Stored out of the way for now.
First prototype of road wheel, High pressure 100mm ID water pipe with a 1mm steel rim.
 
First prototype of road wheel, High pressure 100mm ID water pipe with a 1mm steel rim, will use 2mm instead and then make the inserts for inside out of 2mm as well. The steel rim had to be pressed into the pipe so should not go anywere