Sizing things up
Saturday, 1 September 2012
Have tacked the top on the turret base so i can get it alinged to put in the tabs to screw the top.
Seam welded the top and ground it back down to close to finish.
Seam welded the top and ground it back down to close to finish.
Here you can see the base after i have seam welded it, it eat alot of weld to fill aound the slew plate |
Tis is the PC for controlling the turret |
Subscribe to:
Posts (Atom)